Captain’s Choice Motel Contaminated Site

  • On-time

    -without modifications to original contract

  • Within Budget

    -without modifications to original contract

  • 2012 & 2013

    Completed: Characterization, Interim Remedial Action

  • 2014-

    Ongoing: Monitoring and System Maintenance

Characterization identified failed UST and coordinated installation of groundwater interception system installed to continuously processes polluted water through oil-water-separator and granulated activated carbon filter.  Ongoing operation has proven successful and biannual sampling demonstrated effluent is satisfactory while over 75 gallons of fuel has been recovered so far.

President, Larry Beck (907) 314-0109.